Features:
Vacuum dryer standard model.
The valve and vacuum gauge for the vacuum pump connection are configured in the front operating panel part for easy piping and operation
Double-layer doors (toughened glass doors and polycarbonate doors for protection)
The use of heat-resistant silicon compounds, durability, good air tightness
In addition to easy to confirm the measured value and set value of PV,SV two-stage disy, but also use the anti-temperature setting temperature disy
温度控制,防过升设定都是可由数字设定,标准Model.
Attachment: Check the file
※ Products with an inspection certificate refer to the original Azovan products that have been inspected for control and motor at the time of delivery and have been issued with an inspection certificate.
Products that support verification services (IQ/OQ). Please contact our company
※ Verification service refers to the service that conducts installation qualification verification (IQ) and operation performance qualification verification (OQ) at the customer's site and submits inspection documents.
Specifications:
Vacuum dryer standard model.
In order to facilitate pipe distribution and operation, the valve and vacuum gauge for vacuum pump connection are configured in the front operation panel
Double doors with reinforced glass doors and polycarbonate doors for protection.
Because of the use of heat-resistant silicone, so durability and sealing are very good
In addition to the PV·SV two-stage disy that is easy to confirm the measured value and set value, the set temperature disy is also used to prevent over-heating
Temperature control and overrise prevention Settings can be set digitally for standard models.
Attachment file: Check check file
※ Products with inspection certificates refer to the AZONE original service that controls the delivery, checks the motor system, and issues inspection certificates.
Products that correspond to the verification service (IQ/OQ). Please do ask.
* Verification service refers to the service of qualification verification (IQ) and operation performance qualification verification (OQ) during installation at the customer's site, and submission of inspection documents
【 Specification sheet 】
※ It takes about 18 days to ship from Japan in case of storage in Japan